Feasibility Study and Preliminary Design of Waste Water Pumping Station Krnjaca - Beograd, Serbia

Client: Agency for Construction and Land Development of Belgrade, Serbia
Start Date (Month/Year): November 2004
Completion Date (Month/Year): February 2006
Staff Number: 13

Narrative Description of Project:
The suburb Krnjaca is situated northerly of the Belgrade city on the northern Danube bank. The waste water of this small town, which will have approx.100,000 inhabitants, is discharged without treatment into the Danube. The drainage system of Krnjaca exists rudimentarily and dewatered to the bank area of the Danube. The first step is design of raw wastewater and treated water pumping station. Design of wastewater treatment plant is not in the scope of this project within the scope of the project work, and the most feasible pumping station design is chosen.

Description of Actual Services Provided by ITSC:
The feasibility study and preliminary design for the wastewater pumping station Krnjaca covers the following services:
• Investigation and evaluation of relevant planning data
- Wastewater quantities
- Data and boundary conditions of the planned drainage system
- Geological and soil-mechanical data
- Hydro-logic data (water levels of the Danube for different discharge occurrences)
• Evaluation of different alternatives regarding the local conditions
• Determination of investment costs and operating costs , Proof of the feasibility
• Preparation of preliminary design for chosen alternative for raw wastewater and effluent pumping


ITSC copyright 2016 © . All right reserved
Developed by Avesta Group and powered by Microsoft Azure