Water Supply Improvement Project in Kurdistan Region Package ll

Full Project Title: Equipment Installation Work of Water Supply Improvement Project in Kurdistan Region Package II
Client: SSangyong Engineering & Construction Co., Ltd

ITSC has signed a contract with SSangyong Engineering & Construction Co., Ltd for the improvement of water supply in the Kurdistan region. It is located in Halabja, Kurdistan located in Iraq.  This project includes engineering work, documentation, material supply, construction work, and administration/accommodation services.  This procedure is being led by a project manager and the plan will include all the required activity, manpower, and equipment to ensure the achievement of job requirements starting from move to site until the final acceptance of mechanical completion work. Once the mobilization work plan has begun each and every equipment installation will be submitted for remarks and approval from Ssangyoung engineering office before we start any physical work at site.

Description of Mechanical Work Provided:
According to the mechanical work within the project’s agreement, there is an emphasis on the following teams:
-Pump & Rotating machinery
-Hydraulic outdoor equipment
-Crane installation team
-Pipe & Valves installation
-Steel structure fabrication
The construction work will include direct and indirect labor, utilities, equipment erection work, inspection & examination, and other work. That work may include preparation and obtainment of documents, necessary protection of equipments and materials against rust and damage, return of surplus and scrap material to the area designated by SSY ENC, Welder Qualification Test(if required), site and cleaning disposal, safety net and other necessary facilities for erection and inspection, scaffolding work, steel plate for rigging and access way, and preservation.


Description of Instrumental Work Provided:
It includes instrumental and electrical work for the hoist crane, analyzer, electromagnetic flow meter, motor operated valves, pumps, and electricity room in addition to providing primary and secondary pump systems. Moreover, grit removal system and raw water systems are within the scope of the work.

Other systems include:

-Rapid mixer
-Clariflocculator 
-Sludge pit
-Filtration
-Treated water pump
-Chemical dosing
-Chlorination dosing
-Polymer dosing
-PBT
-NDR1, NDR2, and NDR3

Description of Commissioning Work Provided:
The general scope of the commissioning work of the project covers various tests, such as medical, cable, functional, and performance. Permanent water and power supply are also provided in addition to environmental pollution control and temporary warehouse. This branch of work focuses on manpower mobilization, temporary facilities, services, equipment, and security.  